Scheduling order changes when Modifiers are selected.
For hair color appointments, we would like to use Add-Ons to add haircuts; and use Modifiers for long/thick hair, conditioning treatments, etc.
However, whenever Modifiers are selected, the Add-on service gets bumped to the top of the list of services. So the system schedules the haircut first then the color and modifiers. If no Modifiers are chosen, the Add-On is added correctly, after the base service.
Can this be changed so that the Add-On service is always scheduled after the base service, regardless of whether Modifiers are selected?
It works perfectly when we do in-house scheduling. It is only a problem with online booking.
3
votes
![](https://secure.gravatar.com/avatar/280f1fc436d2e4206a5a98778267a2f1?size=40&default=https%3A%2F%2Fassets.uvcdn.com%2Fpkg%2Fadmin%2Ficons%2Fuser_70-6bcf9e08938533adb9bac95c3e487cb2a6d4a32f890ca6fdc82e3072e0ea0368.png)